一区二区免费看_激情一区二区三区成人_亚洲一区二区三区免费视频_69久久_国产三级理论_一本到在线观看视频不卡

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links
主站蜘蛛池模板: 超污视频网站 | 日韩欧美一区在线观看 | 美女久久 | 天天操天天搞 | 久久精品视频9 | 色屁屁www免费观看影院 | 日韩无| 日本视频免费在线 | 欧美日韩高清一区 | www.一级黄色片 | 久久久久一区二区 | 人人澡人人射 | 亚洲国产精品久久久久 | 流光之城电视剧免费观看完整版高清影视大全 | 成人性色大片 | sese在线观看 | 精品国产欧美精品v | 久草青草| 精品久久久久久中文字幕网 | 婷婷五月色综合 | 在线不卡| 老年人黄色一级片 | 日韩一级| 日本19禁啪啪无遮挡免费观看 | 亚洲一级一片 | 亚洲欧美日韩国产色另类 | 成人免费观看做爰视频胸大 | 国产伊人久久 | 亚洲第二页 | aaa色| 国产精品一区二区久久 | 亚洲人成人一区二区在线观看 | 免费观看欧美一级毛片 | 日韩成人免费视频 | 色六月婷婷亚洲婷婷六月 | 一起操网站 | 国产免费一区二区三区 | 国产乱码精品一区二区三区忘忧草 | 亚洲一区二区三区视频免费 | 一本久道久久综合狠狠爱 | 大学生gayxxxx chinese |